Skip to content
- Based on “Challenge! SJT-1000”, vision to be the super excellent company with the world-best technology, and zero-defect policy, Samjeong Turbine is pursuing World Best Quality thru global quality management system.
- Customer impression, Professionalism, Creativity
- Incoming Inspection
Strict Material Control
# Internal Inspection by Various Standards
# Material Control by History Management
- Line Inspection
Thorough Monitoring & Controlling by Quality Assurance Plan
# Equipment & Measurer Control
# Line Control & Audit by Standard
# Operator Training
- Reliability Test
# Evaluation of Quality Reliability thru Various Test
- Analysis and Evaluation
# Analysis & Evaluation thru Scientific Method
by the Result of Reliability Test
- Final Inspection
# Final Evaluation & Assurance by Customer’s Requirements
- Samjeong Turbine has been driving 6 SIGMA Activity since 2007, and has removed defects out of all kinds of processes including product design and production, office management, and supporting activities, and whole organization moves together towards the goal to reduce quality failure costs and to maximize customer satisfaction.
- Samjeong Turbine has been driving TPM (Total Productive Management) Activity to achieve “World-best efficient plant” with “NO Trouble, NO Defect, NO Accident”, for improving constitution with improving labor & facilities. Thru these TPM activities, we prevent all potential losses out of Life Cycle in Production system to maximize production efficiency.
Go to Top